top of page
AdobeStock_161645068_fin.jpg
AMI (Sanjiang) Calcium Processing Plant (Fugu, China) 

website: www.amicametal.com

​

The plant was build in Fugu, Shannxi in 2019, and can produce about 500mt Ca lump, 500mt Ca granular, and  500mt Ca solid wire monthly. The plant was invested by Shannxi San Jiang Energy Chemical Co., Ltd and AMI Group. With the strong cost, tech. advantage and wide market sales channels of two shareholders, the company is becoming the leading Ca materials supplier in the world.

667441048.jpg
459012145.jpg
988575098.jpg
AMI (Baotou) Foundry Ferro Alloys Plant (Baotou, China)

The plant located in Baotou, Inner Mogolia, and mainly produce foundry ferro alloys, can produce 500mt FeMgSi, 300mt BaSi monthly.

©2035 BY AMI GROUP HOLDING LIMITED.

bottom of page